Employment
Employment history is unavailable.
Education
Education history is unavailable.
Projects & Funding
Projects & funding information is unavailable.
Publications (10)
- Robust estimation with geometric distribution under a class of priors Save
- A two dissimilar unit standby system with arrival time of a repairman and correlated failures and repairs Save
- Cost-benefit analysis of a two-unit standby system with post-repair, activation time and correlated failures and repairs Save
- A two-unit system with correlated failures and repairs, and random appearance and disappearance of repairman Save
- A cold standby system with arrival time of server and correlated failures and repairs Save
- Analysis of a two unit standby system with preparation time and correlated failures and repairs Save
- Analysis of a standby system with dependent repair time and slow switching device Save
- Cost benefit analysis of a complex system with correlated failures and repairs Save
- Cost analysis of a two-unit chargeable standby system with interchangeable units and two types of failure Save
- CHE failure in a two-unit standby system with slow switch, repair and post repair Save