SG
Sonia Goel
Maharishi Markandeshwar (Deemed to be University) Mullana, Maharishi Markandeshwar University, Mullana
Employment
-
Maharishi Markandeshwar (Deemed to be University) Mullana
Education
-
Maharishi Markandeshwar University, Mullana
Projects & Funding
Projects & funding information is unavailable.
Publications (9)
- A Comparative Study of N*2 FSSP with Transportation Time & Processing Time as Trapezoidal Fuzzy Number Save
- Optimization in Three Phase Flowshop Scheduling Problem with Multiple Processor at First Level Including Transportation Time Save
- Rental Cost minimization for FSSP with equipotential machines Save
- Scheduling Involving Equipotential Processors with Constraint as Fuzzy Utilization Time of Jobs Save
- Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines Save
- Branch and bound technique for two stage flow shop scheduling model with equipotential machines at every stage Save
- Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage Save
- NX2 flow shop scheduling problem with parallel machines at every stage, processing time associated with probabilities Save
- Two stage flow shop scheduling model including transportation time with equipotential machines at every stage Save