AK
Ashok Kumar
Indian Institute of Technology (Indian School of Mines), Dhanbad, Central Institute of Mining and Fuel Research, Indian Institute of Technology (Indian School of Mines)
Employment
-
Indian Institute of Technology (Indian School of Mines), Dhanbad Assistant Professor2022 - Present
-
Central Institute of Mining and Fuel Research Senior Scientist2020 - 2022
-
Central Institute of Mining and Fuel Research CSIR Scientist2016 - 2020
-
National Institute of Rock Mechanics Scientist-I2015 - 2016
-
Central Institute of Mining and Fuel Research CSIR Trainee Scientist2013 - 2015
Education
-
Indian Institute of Technology (Indian School of Mines) Doctor of Philosophy2016 - 2021
-
Academy of Scientific and Innovative Research Master of Technology2013 - 2015
-
Indian Institute of Technology Banaras Hindu University Bachelor of Technology2009 - 2013
-
Kendriya Vidyalaya 12th2006 - 2008
-
Kendriya Vidyalaya 10th2004 - 2006
Projects & Funding
Projects & funding information is unavailable.
Publications (46)
- Influence of Thickness of Weak Bedding Planes at Various Positions Within Pillar Height on Strength: a Numerical Modelling Study Save
- Study of pillar behaviour sandwiched between strong and weak layers at great depths Save
- Mechanical behaviors of deep pillar sandwiched between strong and weak layers Save
- Development of design norms for rib/snook during mechanised depillaring by continuous miner Save
- Stability assessment of heightened rib/snook during extraction of a thick coal seam by continuous miner in single lift Save
- Importance of Fracturing Hard and Massive Overlying Strata for Complete Extraction of Thick Coal Seam — Case Studies Save
- Assessment of loading characteristics of resin grouted rock bolts under different confinement pressure through laboratory and numerical modelling studies Save
- Ground control study on bulking factor and caving angle for Indian coalfields Save
- Instrumentation and monitoring for strata control in depillaring Save
- Numerical simulation for design of goaf edge support during caving and stowing methods of strata control management Save